impounding
英 [ɪmˈpaʊndɪŋ]
美 [ɪmˈpaʊndɪŋ]
v. 暂时没收; 扣押; 收留(待领的狗、猫等)
impound的现在分词
柯林斯词典
- VERB 扣押;没收
If somethingis impoundedby policemen, customs officers or other officials, they officially take possession of it because a law or rule has been broken.- The ship was impounded under the terms of the UN trade embargo...
该船因触犯联合国贸易禁运条款而被扣押。 - The police moved in, arrested him and impounded the cocaine.
警察冲进去将他拘捕并没收了***。
- The ship was impounded under the terms of the UN trade embargo...
英英释义
noun
- placing private property in the custody of an officer of the law
双语例句
- Tow guy: The government is impounding it.
政府没收了,这是你的收据。 - The police are impounding homes, cars and personal property belonging to the drug dealers.
警方正在没收毒贩的房子、汽车和私人财产。 - There are no key-ways made in the upper longitudinal joints in Fengman Dam and no grouting before impounding.
丰满大坝纵缝上部未设键槽,蓄水前又未灌浆; - Layout of Dongfeng Hydropower Station and Observation and Analysis of Arch Dam Character in the Early Impounding Stage
东风水电站枢纽布置及初期蓄水拱坝性态观测分析 - Periodic impounding and draining of the water reservoir would be implemented after the projects were in service.
在水库工程运营后,将按计划进行周期蓄、排水。 - Meshif is an honorable man, but I fear that he is growing impatient with me about impounding his ship.
马席夫是一个十分正直的人,但是我害怕他对于我拘留他的船而越来越没耐性。 - In most cases, the waste materials were transported to impounding areas located on privately owned land.
很多情况下,废弃的化学物品会被运到私有土地上的贮物地。 - The main problem on simulation of tectonic stress field after reservoir impounding in the head area of the Three Gorges is the influence of "canyon effect" and "rock soften".
迄今为止,长江三峡库首区蓄水对上地壳构造应力场影响的数值模拟研究中存在的最大问题是未考虑地形“峡谷效应”和库水下渗导致“岩石弱化”的影响。 - With the impounding of Three Gorges Project, study on this problem became urgent.
随着三峡工程完工蓄水,这方面的研究显得愈加迫切。 - Therefore, it is considered that after reservoir impounding, the main bank-slope engineering geological problems of study area is the resurrection of the old landslide on the right bank and the occurrence of new landslide on the left bank.
因此,认为水库蓄水后,研究区主要的岸坡工程地质问题是右岸老滑坡的复活和左岸新滑坡的发生。
